The Baleh Hydropower Plant is a 1,285MW project on the Baleh River in Sarawak. The plant is being developed by Sarawak Energy Berhad (SEB). Fire Safety Design Philosophy (FSDP) including the quantitative risk assessment (QRA) was developed due to the uniqueness of the project.