C1347 – Fire Engineering Consultancy for existing 32-nos aboveground MRT Stations Singapore
This is an assessment of the egress provisions from train platforms of 32 nos. existing aboveground RTS stations along the North-South and East-West lines. It is proposed based on performance based method. These existing stations were designed in accordance to NFPA 130: Standard for Fixed Guideway Transit and Passenger Rail System.
- CFD Smoke simulation
- Egress Simulation
- Literature Review of local and International Codes
C1385 – Fire Engineering Consultancy for existing 11-nos aboveground & 6 nos. of undergroumd MRT Stations, Singapore
Additions & Alterations have been carried out at some of the stations and the ridership has increased.
- Performance Based Submission to SCDF
- Literature Review of local and International Codes
C9181C Downtown Line Stage C (six stations and tunnels)
- Risk Management Facilitator
- Project Safety Review
- Fire and Life Safety
C922 Overrun Tunnels (including OCC and Rail Facilities)
- Risk Management Facilitator
- Project Safety Review
- Fire and Life Safety
EWL Jurong East Station
- CFD Smoke simulation
- Egress simulation
C2107 Thomson Line Station (Shenton Way, Marina Bay & Chinatown Stations), Singapore
- CFD Smoke simulation
- Thermal Comfort
C917 & C918 (3 nos underground stations)
- Fire and Life Safety
C1685 Tuas West Depot
- CFD Smoke simulation
- Natural Ventilation
- Performance Based Design
- Thermal Comfort Simulation
Tuas West Mainline (four stations)
- CFD Smoke simulation
- Natural Ventilation
- Thermal Comfort Simulation
Tai Seng Underground Facility Building
- FD Smoke simulation
- Performance Based Design
Kolkatta Metro, India
- CFD Smoke simulation
- SES Modelling