The project is the Malaysian Power Plant Project. ‘Refinery and Petrochemical Integrated Development’ (RAPID) complex. The proposed Cogeneration Power Plant is designed to produce electrical power required by the RAPID complex users. The total power and steam generation system will be designed to generate about 1,200 MW in electricity and 1,130 t/h of steam. From energy and environment conservation points of view, cogeneration of steam and electricity is to be promoted in a CHP system (Combined Heat and Power system)
LPA had carried out probabilistic and deterministic fire risk assessments with particular focus on the performance of the low rise (1-2 storey) steel structures. The results show that should a fire occur, the proposed provisions and mitigation measures are sufficient to avoid any catastrophic collapse of the steel structures.